So our project has changed a bit. Nick and I are also in Jason's Advanced Production class this semester, and as a class we had to select a script to turn into a film to produce. Jason provided the class with a few different scripts from his past students as possible options to choose from. One of the scripts that Jason provided as an option was a script that I wrote. The class ended up choosing my script and that is now what we are producing. Jason told Nick and I that we could in turn use this project as our capstone project as well. So I am the director, screenwriter, and in charge of casting for the film.
Production Agenda:
1) Casting Call - I am currently preparing a flyer to post to get people to come and audition
2)Location
3)Props
4)Production Schedule
Pre Production:
2/19-3/5
Production:
3/10-4/9
Post Production:
4/9-4/23
In terms of capstone:
Because the entire film would not be done by the time we have to screen it for capstone, Jason told us that we need to have at least a 2-3 minute scene edited and ready to show as well as the other deliverables. (script, DVD, press kit, electronic press kit, stills, promo poster, etc.)
No comments:
Post a Comment